During Engineering & Design phase

engineering design

We servicing both Owner and EPC Engineering & Design teams during the Engineering & Design phase (30/60/90% model review).

CAD Design including checking Material and Equipment Specification, Requisitioning, Bid Evaluations, Data Sheet Specifications, Process Calculations. Each area operates with the most advanced technological tools in order to guarantee Optimized plants also in term of quality and safety.

The extensive use of computer-aided Design/Engineering (CAD/CAE) applications for Plant Design and construction allows integration between the Engineers of multiple disciplines working on a project simultaneously, improving Design Coordination, reducing errors, and increasing productivity. Our Clients include major Engineering Contractors as: Technip, Fluor,Linde,Aker Solutions, Saipem, Foster Wheeler whom are executing major Oil & Gas, Refinery, Petrochemicals and PowerStation projects with support of Global Energy.

ENG1.jpgENG10.jpgENG8.jpg

Process Engineering
Global Energy Engineers supervised and leads the execution of various phases of refinery modification and expansion projects starting from Feasibility studies, Front End Engineering and Design and EPCC to ensure a safe operable and economic design within the framework of the project budget, material requirements, specifications and schedule. Supervised reviews and approves preparation of project proposals, feasibility studies, budget briefs, budget estimates, expenditure requests, economic analysis and authorizations for expenditures. Supervises and approves preparation of contracts, technical information and other information required for the award of design, project management and construction contracts. Supervised overall planning, control and appraisal of the project as defined by the approved scope including monitoring and control of the activities of Consultants for feasibility studies and contractors for Front End Engineering and EPC phases.
  • Licensor selections, Plant Simulation Modelling
  • Equipment Sizing, Material & Balances Calculations
  • Piping & Mechanical Design Review
FEED phase is used to make a basic study and develop cost estimates for FID Final Investmetn Decision. We assist in preparing Scope of Work into Invitation To Tender upon request for quotation for the several EPC Packages and provide a project contract strategy including financial risk assessment.